APM | We work below the waterline
13329
home,page-template,page-template-full_width,page-template-full_width-php,page,page-id-13329,ajax_fade,page_not_loaded,,qode-title-hidden,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-5.0.1,vc_responsive

ENGINEERING

Custom made APM engineering package is provided for each lifting keel system supplied. Complete and detailed 2D and 3D drawings, full structural study and FEM stress analysis including grounding and fatigue events, DNV-GL approval, installation instructions with keel system adjusting and operating manual.

MANUFACTURING

The finished, tested and ready for on board installation APM lifting keel package includes keel fin, carbon trunk, sliding block, lifting cylinders and crash safe or standard lead bulb.

APM KEELS

  • All
  • CRASH SAFE BULB
  • LIFTING KEELS
  • TELESCOPIC LIFTING KEELS

A special keel for your project? We’re here to develop the best solution!

  • Lifting keel

    Double step lifting keel

  • Lifting keel

    Lifting keel with fitted trim tab

  • Lifting keel

    Lifting keel with head lowered

  • Lifting keel

    Lifting keel ready for shipping

  • Lifting keel locking device

    Deck view of locking system

  • Lifting keel

    Sliding system in working order

  • Telescopic lifting keel

    Side view

  • Crash safe bulb

    Impact simulation

  • Crash safe bulb

    Two different lead alloys have been used

FACTS

204

KEELS BUILT

76

LIFTING KEELS

27

YEARS ACTIVE

0

DEFECTIVE KEELS